- Bathroom Accessories
- Kitchen Accessories
- Lockset
- Plumbing / Pipe
- Garden Accessories
- Ceramic
- Cutter
- Electrical
- Faucets
- Hand Tools
- Home Accessories
- Mechanics
- Paint
- Interior Paint
- Spray Paint
- SAMURAI ANTI-RUST
- SAMURAI CANDY COLOUR
- SAMURAI FLAT COLOUR
- SAMURAI FLUORESCENT COLOUR
- SAMURAI HI-TEMP
- SAMURAI HONDA MOTORCYCLE COLOUR
- SAMURAI KAWASAKI MOTORCYCLE COLOUR
- SAMURAI METALLIC COLOUR
- SAMURAI MODENAS MOTORCYCLE COLOUR
- SAMURAI PAINT REMOVER
- SAMURAI PREMIUM COLOUR
- SAMURAI STANDARD COLOUR
- SAMURAI SUZUKI MOTORCYCLE COLOUR
- SAMURAI WOOD STAIN COLOUR
- SAMURAI YAMAHA MOTORCYCLE COLOUR
- Paint Tools
- Plumbing or Pipe
- Power Tools
- BLIMAX
- BOSCH
- BOSSMAN
- DONG CHENG
- AIR BRAD NAILER STAPLER
- ANGLE GRINDER
- BLOWER VACUUM
- CORDLESS DRILL
- CORDLESS RECIPROCATING SAW
- CUT-OFF MACHINE
- DIE GRINDER
- ELECTRIC CIRCULAR SAW
- ELECTRIC DRILL
- ELECTRIC MIXER
- ELECTRIC PLANNER
- ELECTRIC WRENCH
- HEAT GUN
- IMPACT DRILL
- JIG SAW
- MARBLE CUTTER
- ORBITAL SANDER
- PERCUSSION HAMMER
- ROTARY HAMMER
- SANDER POLISHER
- TRIMMER ROUTER
- Safety Accessories
- Spare Part
LOGAM FIMA JAYA ENTERPRISE
HQ (Jelebu, Kuala Klawang)
4-7, Jalan UA 1, Taman Undang Abdullah, 71600 Kuala Klawang, Jelebu, Negeri Sembilan, Malaysia.
+6012-390 0244
+6011-1066 8879
+6011-1066 8879
Branch (Jelebu, Kuala Klawang)
34, Jalan Dato Abdullah, 71600 Kuala Klawang, Negeri Sembilan, Malaysia.
+606-6136237
Branch (Mantin)
Lot 66, Batu 12, 71700 Mantin, Negeri Sembilan, Malaysia.
+6016-665 8879
mantin@fimajaya.com.myA.B.S GLUE EXTRA STRONG 500GM
RM 26.00
600 g
•Ensure surface to be joined are clean, free from dust&grease.
•Apply ABS Solvent Cement evenly to pipe and fitting socket.
•Insert pipe into fitting socket with a slight twisting motion immediately.
•Allow the cement to set firm for 30 minutes before moving pipe.
Full pressure test should only be conducted after 24 hours.
•Apply ABS Solvent Cement evenly to pipe and fitting socket.
•Insert pipe into fitting socket with a slight twisting motion immediately.
•Allow the cement to set firm for 30 minutes before moving pipe.
Full pressure test should only be conducted after 24 hours.